1 |
Supply, Delivery and Ins💝tallation of Closed Circuit Telivision (CCTV) System for the Bureau of Customs Main building Entrance and Exits |
Faire Technologies Inc. |
448,488.00 |
2013-02-000247 |
Notice of Award 12/27/2013Contract Date ***12/27/2013Notice to Proceed 1/23/2014 |
2 |
Supply, Delivery, Ins𓂃tallation and Commissioning of X-ray Inspection Machines to Various Customs Areas in Identified International Airports Entry |
Joint Venture of Facilities Protection, Inc and H20 Security PTY. Ltd. |
47,800,000.00 |
**N/A |
Notice of Award 12/16/2013Contract Date 12/27/2013Notice to Proceed 1/7/2013 |
3 |
v𓆉ai de bet:Rental of Photocopying Machines for CY 🐽2013 |
UBIX Corp. |
2,700,000.00 |
**N/A |
Notice of Award 11/29/2013Contract Date 12/7/2013Notice to Proceed 1/25/2014 |
4 |
Procurement of uniform materials and other paraphernalia for uniformed personnel of the Enforcement and Security Service for CY 2💮013 |
Gibson’s Shoe Facctory, Inc. |
3,023,485.00 |
**N/A |
Notice of Award 10/18/2013Contract Date 10/30/2013Notice to Proceed 11/4/2013 |
5 |
vai de bet:2,000 pcs. Folder Kit |
JDB Pixels Graphic Design Services |
95,088.00 |
2013-12-00246 |
Notice of Award N/AContract Date ***12/23/2013Notice to Proceed N/A |
6 |
🧸vai de bet:1 pc. Fabrication, Conceptualization of Bid Box |
R.S Ramirez Ads Ideas, Inc |
49,628.00 |
2013-12-000243 |
Notice to Proceed N/AContract Date ***12/20/2013Notice to Proceed N/A |
7 |
Lease of W🀅orkshop/Training Venue for the BOC RATS Re-tooling Workshop 40 pax./3 days |
The Heritage Hotel |
132,000.00 |
2013-11-000241 |
Notice of Award –Contract date ***11/26/2013Notice to Proceed — |
8 |
vai de bet:Various Furmiture |
Tambis Enterprise |
229,700,.00 |
2013-11-000240 |
Notice of Award — Contract Date ***11/25/2013Notice to Proceed — |
9 |
vai de bet:Various Medicine |
Ehtijar Trading |
105,930.00 |
2013-11-00226 |
Notice of Award –Contract Date ***11/11/2013Notice to Proceed — |
10 |
v🎉𝕴ai de bet:4 sets Various Books 7 unit Network Lincense |
CD Technologies Asia Inc. |
149,167.20 |
2013-10-000223 |
Notice of Award –Contract Date ***10/25/2013Notice to Proceed — |
11 |
Repair/Renovation of the mezzanine of Room 201 to be used by the Trade Tra꧒nsparency♉ Unit (TTU) located at the 2nd floor, Port of Manila Building |
Cambros Construction Group, Inc. |
1,518,240.00 |
2013-10-000219 |
Notice of Award *10/3/2013Contract Date ***10/17/2013Notice to Proceed 10/17/2013 |
12 |
Philippine Tropical fabric uniform for BOC E🐬mployees |
Asia Textile Mills, Inc. |
2,869,776.00 |
2013-10-000214 |
Notice of Award –Contract Awarded ***10/14/2013 |
13 |
vai de bet:600 pcs. Posters for ARTA Compliance |
R.S. Ramirez Ads Ideas, Inc. |
210,300.00 |
2013-10-000213 |
Notice of Award –Contract Date ***10/14/2013Notice to Proceed — |
14 |
vai de be🦹t:2,628 pcs. Name Plate for BOC Employees |
Limbag Enterprise |
367,920.00 |
2013-10-000212 |
Notice of Award –Contract Date ***10/10/2013Notice to Proceed — |
15 |
vai de bet:Various construction supplies |
Rentrade Marketing |
95,100.00 |
2013-10-000211 |
Notice of Award –Contract Date ***10/14/2013Notice to Proceed — |
16 |
vai de bet:Various Office Supplies |
Limbag Enterprise |
370,400.00 |
2013-10-000210 |
Notice of Award –Contract Date ***10/11/2013Notice to Proceed — |
17 |
vai de bet:1 unit Scanner 3 units Des♔ktop Computers |
Rentrade Marketing |
213,975.00 |
2013-10-000205 |
Notice of Award –Contract Date ***10/8/2013Notice to Proceed — |
18 |
Office Supplies 100 pcs. Wireless Mous🌄e 200 pcs. Mouse Pad with BOC logo Print |
RMZ Enterprises |
177,000.00 |
2013-10-000202 |
Notice of Award –Contract Date ***10/3/2013Notice of Proceed — |
19 |
vai de bet:Laboratory Examinationಞ for 200 BOC Employees |
F.G. Alviar Diagnostic Laboratory |
84,000.00 |
2013-10-000201 |
Notice of Award –Contract Date ***10/3/2013Notice to Proceed — |
20 |
vai de bet:NUCTECH 6 mos Jul to Dec 2013 |
Nuctech Company Limited |
126,449,026.20 |
**N/A |
Notice of Award 10/1/2013Contract Date 10/1/2013Notice to Proceed 10/1/2013 |
21 |
vai de bet:Battery for XIP M♋otor Vehicle Scanning Unit |
Grace Archive Marketing |
74,800.00 |
2013-09-000200 |
Notice of Award –Contract Date ***9/27/2013Notice to Proceed — |
22 |
Repaiܫr/Rehabilitation of roofing of the Land Bank and its affected areas at the Port of Manila Building |
ESJ Builders & Design |
834,718.00 |
2013-09-000198 |
Notice of Award *9/10/2013Contract Date ***9/24/2013Notice of Proceed 9/24/2013 |
23 |
Repair/Renovation of the President’s Room, Customs Capacity🔯 Building Center at the 4th floor, Port of Manila Building |
ESJ Builders & Design |
1,820,664.10 |
2013-09-000197 |
Notice of Award *9/10/2013Contract Date ***9/20/2013Notice to Proceed 9/20/2013 |
24 |
Repair / Repainting of the Exterior Portiꦚon facade at the CRIC Building |
RFN Contruction |
1,450,645.00 |
2013-09-000196 |
Notice of Award 8/15/2013Contract Date ***9/20/2013Notice to Proceed 9/24/2013 |
25 |
Refurbishment and Renovation of 🦄the Administration Office located ⭕at the 2nd floor, OCOM Building |
Cambros Construction Group, Inc. |
1,668,513.60 |
2013-09-000195 |
Notice of Award *9/11/2013Contract Date ***9/20/2013Notice to Proceed 9/20/2013 |
26 |
vai de bet:Printing 4,ꦉ000 copies of Aduana Newsletter |
BAF Printing Press |
162,000.00 |
2013-09-000190 |
Notice of Award –Contract Date ***9/16/2013Notice to Proceed — |
27 |
Repair of Office facility and Enhancement of comfort room and affected areas of PDEA at the ground floor, Old 🎉NPO Building |
ISJ Builders & Design |
720,681.80 |
2013-09-000187 |
Notice of Award *8/13/2013Contract Date ***9/13/2013Notice to Proceed 9/13/2013 |
28 |
vai de bet:67 pcs. Various Office Signages |
R.S Ramirez Ads. Ideas, Inc. |
65,325.00 |
2013-09-000186 |
Notice of Award –Contract Date ***9/11/2013Notice to Proceed — |
29 |
Improvement of the Office of the Chief, Administrative Division and Office of the For﷽ms and Stamps located at the 2nd floor, MICP |
Marcos S. Gonzales Contruction Company, Inc. |
1,589,438.76 |
2013-09-000185 |
Notice of Award *8/3/2013Contract Date ***9/10/2013Notice to Proceed 9/10/2013 |
30 |
vai de bet:Various Conditioning Supplies |
Grace Achieve Marketing |
160,950.00 |
2013-09-000183 |
Notice of Award –Contract Date ***9/9/2013Notice to Proceed — |
31 |
vai de bet:Various Motor Vehicle Supplies |
Lorenjo’s Trading |
141,440.00 |
2013-09-000182 |
Notice of Award –Contract Date ***9/5/2013Notice to Proceed — |
32 |
Installation of metal grills, repair of drainage💃 syst🐲em, Replacement of broken tiles at X-ray Inspection project Building |
OEM Builders |
1,063,595.98 |
2013-08-000177 |
Notice of Award *8/8/2013Contract Date ***8/30/2013Notice to Proceed 8/30/2013 |
33 |
Constructi꧃on of Extension of the Annex Building at the Bureau of Customs, Port of Aparri |
OEM Builders |
1,868,078.98 |
2013-08-000176 |
Notice of Award *8/8/2013Contract Date ***8/30/2013Notice to Proceed 8/30/2013 |
34 |
Repair/Expansion of General Servic𒀰es Division storage facility and Repair of affected areas at the 2nd ꦆfloor, OCOM Building |
ISJ Builders & Design |
1,741,392.05 |
2013-08-000175 |
Notice of Award *8/13/2013Contract Date ***8/29/2013Notice to Proceed 8/30/2013 |
35 |
Repair / renovation of the office of the Deputy Collector for Operations at the 3rd floor, POMꦦ Building |
Marcos S. Gonzales Construction Company, Inc. |
1,065,261 |
2013-08-000174 |
Notice of Award *7/16/2013Contract Date ***8/27/2013Notice to Proceed 8/27/2013 |
36 |
Imprꦺovement of the Office of the Chief❀ and Assistant Chief of the Formal Entry Division of MICP |
Marcos S. Gonzales Construction Company, Inc. |
1,155,798.38 |
2013-08-000173 |
Notice of Award *8/8/2013Contract Date ***8/27/2013Notice to Proceed 8/27/2013 |
37 |
Additional Works on the Customhouse, Port of D🍸umaguete |
Cambros Construction Group, Inc. |
16,450,004.15 |
2013-08-000172 |
Notice of Award *8/8/2013Contract Date ***8/27/2013Notice to Proceed 8/27/2013 |
38 |
Provision of septic vault and de-cꦡlogging of sewer li❀ne, drainage system and water line at the front of CRIC Building |
ISJ Builders & Design |
999,141.05 |
2013-08-000171 |
Notice of Award *8/13/2014Contract Date ***8/27/2013Notice to Proceed 8/27/2013 |
39 |
vai de bet:Printing of 10,000 pcs. BOC Primer |
Joshnar Printing Pages |
420,000.00 |
2013-08-000167 |
Notice of Award –Contract Date ***8/12/2013Notice to Proceed — |
40 |
Repa♛ir / Rehabilitation of the 🦩entire main water line system at the Port of Manila, Building |
ISJ Builders & Design |
1,389,998.50 |
2013-08-000166 |
Notice of Award *8/8/2013Contract Date ***8/7/2013Notice to Proceed 8/11/2013 |
41 |
Replꩲacement💛 of the broken tiles at the 2nd floor, Port of Manila Building |
RFN Construction |
474,289.00 |
2013-08-000165 |
Notice of Award *7/29/2013Contract Date ***8/6/2013Notice to Proceed 8/5/2013 |
42 |
Repainting of the ceilings and walls of the Administr🀅ative, operations and Assessment building at the MICP |
Cambros Construction Group, Inc. |
1,664,738.75 |
2013-08-000164 |
Notice of Award *7/31/2013Contract Date ***8/6/2013Notice to Proceed 8/6/2013 |
43 |
Repair /Enhancement of comf🌼ort room and Repair / Repainting of Affected areas at the Intelligence Group Office, Ground Floor, OCOM Building |
ISJ Builders & Design |
1,027,610.00 |
2013-08-000163 |
Notice of Award *8/8/2013Contract Date ***8/5/2013Notice to Proceed 8/9/2013 |
44 |
Provision of one (1) storage room for the HRMD at the Ground floor, OLD NPO Buildi𓂃ng |
Cambros Construction Group, Inc. |
1,749,486.60 |
2013-08-000162 |
Notice of Award *7/31/2013Contract Date ***8/5/2013Notice to Proceed 8/6/2013 |
45 |
Repair / Rehabilitation of switc🎃h gear, power house and electrical system including concreting of power house at the ground floor, Port of Manil😼a |
ISJ Builders & Design |
1,431,372.85 |
2013-08-000159 |
Notice of Award *7/30/2013Contract Date ***8/2/2013Notice to Proceed 8/2/2013 |
46 |
vai de bet:2 sets Desktop Computers |
Grace Achieve Marketing |
100,000.00 |
2013-07-000158 |
Notice of Award –Contract Date ***7/30/2013Notice to Proceed — |
47 |
Repair / R🤡enovation and waterproofing at the Port 🔯of Manila Tower |
ISJ Builders & Design |
1,676,286.25 |
2013-07-000157 |
Notice of Award *7/23/2013Contract Date ***7/31/2013Notice to Proceed 7/31/2013 |
48 |
Repair𓄧 / Renovation of Customs Clearance Area at the Tipo Gate, Port of Subic |
ISJ Builders & Design |
1,842,948.45 |
2013-07-000155 |
Notice of Award *7/23/2014Contract Date ***7/30/2013Notice to Proceed 7/26/2013 |
49 |
Provision of the 2nd flo𝐆or of the COA s♊tock room at the 2nd floor, Old NPO Building |
ISJ Builders & Design |
1,758,580.35 |
2013-07-000154 |
Notice of Award *7/23/2013Contract Date ***7/30/2013Notice to Proceed 7/26/2013 |
50 |
vai de bet:1 pc. BOC Mural Painting |
Genaro Trading |
107,300.00 |
2013-07-000153 |
Notice of Award –Contract Date ***7/29/2013Notice to Proceed — |
51 |
vai de bet:10 units Laptop |
Columbia Technologies |
493,810.00 |
2013-07-000151 |
Notice of Award –Contract Date ***7/29/2013Notice to Proceed — |
52 |
Provision of a conference room for the Risk Management Office loca🌺ted at the 4th floor, POM ♉Building |
TRM Construction & Development Corp. |
1,491,042.50 |
2013-07-000150 |
Notice of Award *7/26/2013Contract Date ***7/29/2013Notice to Proceed 8/5/2013 |
53 |
Renovation / Improvement of E-Learning Center located at t🌠he 4th floor, Por𒆙t of Manila Building |
J.E.I Construction |
1,781,047.80 |
2013-07-000148 |
Notice of Award *7/30/2013Contract Date ***7/29/2013Notice to Proceed 8/8/2013 |
54 |
Co💖mputer Accessor🔯ies – 15 units APC UPS Back-up 1kVA |
Mediasys Corporation |
345,000.00 |
2013-07-000146 |
Notice of Award –Contract Date ***7/24/2013Notice to Proceed — |
55 |
vai de bet:150 pcs. Emergency Lights |
MAARO Trading A.G.S. |
299,250.00 |
2013-07-000144 |
Notice of Award –Contract Date ***7/19/2013Notice to Proceed — |
56 |
vai d𒀰e bet:Repainting of 307 building at the Port of Sub🐼ic |
ISJ Builders & Design |
1,634,285.75 |
2013-07-000143 |
Notice of Award *7/16/2013Contract Date ***7/19/2013Notice to Proceed 7/19/2013 |
57 |
Refurbishment and Re🅷novation to be done on the Office of the Deputy Commissioner and two (2) extension offices of RATS Group at the 4th floor, Port of Manila Building |
Marcos S. Gonzales Construction Company, Inc. |
1,465,391.61 |
2013-07-000142 |
Notice of Award *7/16/2013Contract Date ***7/19/2013Notice to Proceed 7/19/2013 |
58 |
Refurbishment and Renovation of the Budget Division and Financial Management Office at 🐭the 2nd floor, OCOM Building |
Marcos S. Gonzales Construction Company, Inc. |
1,854,432.06 |
2013-07-000141 |
Notice of Award *7/16/2013Contract Date ***7/19/2013Notice to Proceed 7/19/2013 |
59 |
vai de bet:80 pcs. Kyocera Toner for Model 1320DN |
Philcopy Corp. |
499,920.00 |
2013-07-000140 |
Notice of Award –Contract Date ***7/15/2013Notice to Proceed — |
60 |
Supply of Labor and Materia𒅌ls for Janitorial and Maintenance Services in selected BOC offices/ports for📖 CY 2013 |
ALERT General Services Corp. |
Lot 1 – Php 17,133,651.28 Lot 2 – Php 3,212,559.61 Lot 3 – Php 6,425,119.23 |
**N/A |
Notice of Award 7/8/2013Contract Date 7/15/2013Notice to Proceed 7/29/2013 |
61 |
vai de bet:Various Server Accessories |
Mediasys Corporation |
325,417.00 |
2013-07-000138 |
Notice of Award –Contract Date ***7/8/2013Notice to Proceed –“ |
62 |
Repair of ceiling, dilapidated roofing, electrical layout and fixtures, painting works and the affected areas on the hallway outside the Risk Management O﷽ffice located at the 4th floor, POM Building |
TRM Construction & Development Corp. |
882,500.25 |
2013-07-000137 |
Notice of Award *6/25/2013Contract Date ***7/5/2013Notice to Proceed 7/5/2013″ |
63 |
Renovation and Refurbishment of the hallw🎐ay and two (2) offices at the Prosecution and Ligitation Division, 4th floor, port of Mani🌱la Building |
Marcos S. Gonzales Construction Company, Inc. |
1,564,443.19 |
2013-07-000136 |
Notice of Award *6/25/2013Contract Date ***7/5/2013Notice to Proceed 7/2/2013″ |
64 |
Renovation on Inbond Room, Baggage Asst. Division and Quarter Room and Interline Baggage Section and Inclusion Room at Arrival Area,𒁃 2nd floor, NAIA Terminal 1 |
OEM Builders |
1,869,726.23 |
2013-07-000135 |
Notice of Award *6/25/2013Contract Date ***7/4/2013Notice to Proceed 7/3/2013 |
65 |
Repair ♌of leaking confort room, repair of the dilapidated pest-infected ceiling and affected areas of the Office of the Deputy Commis💫sioner, Intelligence Group located at the ground floor, OCOM Building |
ISJ Builders & Design |
1,121,322.00 |
2013-07-000134 |
Notice of Award *6/25/2013Contract Date ***7/4/2013Notice to Proceed 7/4/2013″ |
66 |
vai de bet:Various Medicines |
AK Pharma |
73,035.00 |
2013-07-000132 |
Notice of Award –Contract Date ***7/11/2013Notice to Proceed –“ |
67 |
Repair / Replacement of the lacking roof, doᩚᩚᩚᩚᩚᩚᩚᩚᩚ𒀱ᩚᩚᩚwnsprout and concrete gutter at thꦅe Old NPO building |
ISJ Builders & Design |
1,890,270.00 |
2013-07-2013 |
Notice of Award *7/1/2013Contract Date ***7/4/2013Notice to Proceed 7/4/2013″ |
68 |
Printig🎐 of BOC Vision and💛 Mission 50 pcs. 4×6 ft. 30 oz. 50 pcs. 3×4 ft. 30 oz. |
Limbag Enterprise |
99,800.00 |
2013-07-000130 |
Notice of Award –Contract Date ***7/2/2013Notice to Proceed –“ |
69 |
vai de bet:Repair of the roofing at t♔he OCOM Building |
Cambros Construction Group, Inc. |
1,660,738.80 |
2013-07-000129 |
Notice of Award *6/25/2013Contract Date ***7/1/2013Notice to Proceed 6/26/2013″ |
70 |
vai de ℱbet:350 pcs. Variousꦿ Poster for ARTA Compliance |
R.S. Ramirez Ads Ideas, Inc. |
126,400.00 |
2013-06-000127 |
Notice of Award –Contract Date ***6/28/2013Notice to Proceed –“ |
71 |
Repair / Rehabilation of custom offices at the Arrival Department of the NAIA Terminal 1 (Arrival Passemger Customs Office, Collector’s Office, Men’s and Women’s quarters and Hallways) at the 2nd floor, NAIA Terminal 1,💫 Paranaque City |
OEM Builders |
1,844,162.35 |
2013-06-000125 |
Notice of Award *6/7/2013Contract Date ***6/25/2013Notice to Proceed 6/25/2013″ |
72 |
Provision of extension office f💞or Special assistant of the Deputy Commi𒁃ssioner, Intelligence Group at the Ground Floor, old NPO Building |
ISJ Builders & Design |
1,180,597.00 |
2013-06-000124 |
Notice of Award *6/18/2013Contract Date ***6/25/2013Notice to Proceed 6/25/2013″ |
73 |
Refurbishment of four (4) offices for Port Collector Harbour Center Te♒rminal at Harbour Center Terminal |
Marcos S. Gonzales Construction Company, Inc. |
1,238,207.09 |
2013-06-000123 |
Notice of Award *6/14/2013Contract Date ***6/21/2013Notice to Proceed 6/21/2013″ |
74 |
Refurbishment of the Accounting Division Office🔴 located at the 2nd floor of the OCOM Building |
Cambros Construction Group, Inc. |
1,979,783.00 |
2013-06-000122 |
Notice of Award *6/14/2013Contract Date ***6/21/2013Notice to Proceed 6/21/2013″ |
75 |
Repair / Renova🃏tion of the Office of the Deputy Collector for the Administration, MICP located at the 2nd floor Administration building, MICP |
Cambros Construction Group, Inc. |
1,756,705.00 |
2013-06-000121 |
Notice of Award *6/14/2013Contract Date ***6/21/2013Notice to Proceed 6/21/2013″ |
76 |
vai de bet:Materials♑ for 7 units Split type aircon |
MAARO Trading A.G.S. |
171,791.74 |
2013-06-000119 |
Notice of Award –Contract Date ***6/19/2013Notice to Proceed –“ |
77 |
Provision of cabinets and cubicles, replaceme🅠nt of Tiles of the entire office, Enhancement of comfort rooms and Replacement of glass window at Informal Entry Division, Port of Manila |
ISJ Builders & Design |
1,659,397.00 |
2013-06-000118 |
Notice of Award *6/14/2013Contract Date ***6/17/2013Notice to Proceed 6/14/2013″ |
78 |
vai de bet:35,000 pcs. ꦑStickers for Inventory use Purꦍpose |
Limbag Enterprise |
472,500.00 |
2013-06-000115 |
Notice of Award –Contract Date ***6/7/2013Notice to Proceed –“ |
79 |
Repair / Renovation of the field office of the Risk Management ♉Office located at the 2nd Floor, Old NPO Building |
Marcos S. Gonzales Construction Company, Inc. |
1,672,635.00 |
2013-06-000114 |
Notice of Award *5/24/2013Contract Date ***6/7/2013Notice to Proceed 6/7/2013″ |
80 |
Provision of Mezzanine floor and Repair of affected areas at the Informal Entry Division, Ground Floor, Port꧂ of M🦹anila Building |
ISJ Builders & Design |
1,817,215.00 |
2013-04-000064 |
Notice to Proceed *3/20/2013Contract Date ***4/1/2013Notice to Proceed 3/27/2013″ |
81 |
Repair and Repainting of the New Offices of the Export Division & CCCD located at the Office of the Collection D𓃲ivi🌱sion, Ground Floor, Operation Building, MICP |
TRM Construction & Development Corp. |
1,349,535.50 |
2013-06-000117 |
Notice of Award *5/24/2013Contract Date ***6/17/2013Notice to Proceed 6/17/2013″ |
82 |
Establi🌺shment of ESS Multi-Purpose Center at the 2nd floor, Old NPO Buildi❀ng |
Marcos S. Gonzales Construction Company, Inc. |
1,879,168.20 |
2013-5-000112 |
Notice of Award *5/24/2013Contract Date ***5/31/2013Notice to Proceed 6/9/2013″ |
83 |
vai de bet:Various Office Supplies |
Limbag Enterprise |
483,750.00 |
2013-05-000110 |
Notice of Award –Contract Date ***5/30/2013Notice to Proceed –“ |
84 |
Provision of storage facility / off🍬ice for COA at the ༺2nd Floor, Old NPO Building |
ISJ Builders & Design |
1,695,756.00 |
2013-05-000109 |
Notice of Award *5/24/2013Contract Date ***5/30/2013Notice to Proceed 5/29/2013″ |
85 |
Provision of two (2) store😼y level storage facilities with 🥃open shelves and cabinets at Port of Subic |
ISJ Builders & Design |
1,890,368.00 |
2013-05-000108 |
Notice of Award *5/16/2013Contract Date ***5/30/2013Notice to Proceed 5/29/2013″ |
86 |
Repair / refurbishment of Ge🍃neral Services Division Office located a꧒t Ground Floor, OCOM Building |
Cambros Construction group, Inc. |
1,856,153.55 |
2013-05-000106 |
Notice of Award *5/15/2013Contract Date ***5/29/2013Notice to Proceed 5/29/2013 |
87 |
Repair / Refurbishment of Human resource Managem🥃ent Division Office located at Second Floor, OCOM Building |
Cambros Construction Group, Inc. |
1,870,307.15 |
2013-05-000105 |
Notice of Award *5/15/2013Contract Date ***5/29/2013Notice to Proceed 5/29/2013″ |
88 |
Refurbishment and Renovation of theꦯ Office and lobby of FED, EPU at the 1st f🐽loor, Port of Manila |
Marcos S. Gonzales Construction Company, Inc. |
1,622,329.80 |
2013-05-000103 |
Notice of Award *5/15/2013Contract Date ***5/23/2013Notice to Proceed 5/23/2013″ |
89 |
Provision of storage space for the receiving area of the Office of the Commissioner at the🐟 2nd Floor, Old NPO Building |
Marcos S. Gonzales Construction Company, Inc. |
1,679,605.20 |
2013-05-000102 |
Notice of Award *5/15/2013Contract Date ***5/23/2013Notice to Proceed 5/23/2013″ |
90 |
vai de bet:40 pcs. External DVD Writer |
Grace Achieve Marketing |
88,000.00 |
2013-05-000101 |
Notice of Award –Contract Date ***5/22/2013Notice to Proceed –“ |
91 |
Repair of ceiling, roofing and wooden partitions of the Cashꦦ Diꦿvision, Port of Manila Building |
ISJ Builders & Design |
1,473,356.00 |
2013-05-000100 |
Notice of Award *5/16/2013Contract Date ***5/22/2013Notice to Proceed 5/22/2013″ |
92 |
Provision of Electrical power supply for the new installed elevator system aജt POM Building |
ISJ Builders & Design |
702,865.00 |
2013-05-000099 |
Notice of Award *5/16/2013Contract Date ***5/22/2013Notice to Proceed 5/21/2013″ |
93 |
Provision of canopy type / rain gutter at MICP fi⛦eld Office and X-ray scanning area at MICP |
ISJ Builders & Design |
992,151.00 |
2013-05-000098 |
Notice of Award *5/3/2013Contract Date ***5/22/2013Notice to Proceed 5/22/2013″ |
94 |
Repair / Enhancement﷽ of Administration Bui﷽lding, storage facility and pantry at One-Stop-Shop, Bauan, Batangas |
ISJ Builders & Design |
948,458.00 |
2013-05-000097 |
Notice of Award *5/16/2013Contract Date ***5/22/2013Notice to Proceed 5/22/2013″ |
95 |
vai de b🐽et:10 units Air Condition with 20 hp. Window Type |
Ethijar Trading |
326,060.00 |
2013-05-000096 |
Notice of Award –Contract Date ***5/21/2013Notice to Proceed –“ |
96 |
Repair / De-clogging of🙈 D🍨rainage system and Provsision of open trenches at Gate 3 along NPO building |
ISJ Builders & Design |
1,220,032.00 |
2013-05-000094 |
Notice of Award *5/3/2013Contract Date ***5/14/2013Notice to Proceed 5/10/2013″ |
97 |
Repair / Replacement and Proision of trenches for clogged sewe෴r and drainage system at ESS building |
ISJ Builders & Design |
1,104,273.00 |
2013-05-000093 |
Notice of Award *5/3/2013Contract Date ***5/14/2013Notice to Proceed 5/10/2013″ |
98 |
Provision of septic vault, de-clogging, sewer line and drainage system including the repair of water lin♑e in front of t🍸he CIIS building |
ISJ Builders & Design |
1,052,099.00 |
2013-05-000092 |
Notice of Award *4/17/2013Contract Date ***5/6/2013Notice to Proceed 5/3/2013 |
99 |
Additional wor⛄ks to be done on the storage facility of Post Entry Audit Group (PEAG) located at the 2nd floor of the Old NPO Building |
Marcos S. Gonzales Construction Company, Inc. |
1,462,546.80 |
2013-05-000091 |
Notice of Award *4/23/2013Contract Date ***5/3/2013Notice to Proceed 5/3/2013 |
100 |
Rehabilitation and Improvement of the dilapidated Public Comfort Rooms at the 4th floor, Port🌳 ꦕof Manila |
Marcos S. Gonzales Construction Company, Inc. |
1,586,945.60 |
2013-05-000090 |
Notice of Award *4/23/2013Contract Date ***5/3/2013Notice to Proceed 5/2/2013 |
101 |
Re✃pair / Improvement of MICP offices located at the 3rd fl🥀oor, MICP Building |
Marcos S. Gonzales Construction Company, Inc. |
1,871,976.60 |
2013-05-000111 |
Notice of Award –Contract Date ***5/31/2013Notice to Proceed 6/7/2013 |
102 |
vai de bet🐬:400🌃0 copies Aduana BOC Official Newsletter |
Joshmar Printing Press |
164,000.00 |
2013-05-000104 |
Notice of Award –Contract Date ***5/28/2013Notice to Proceed — |
103 |
Repair / Renovation of Admi🉐nistrative Section and Conference Room and Provꦺision of Wooden shelves and Cabinets at San Fernando, La Union |
ISJ Builders & Design |
1,576,382.00 |
2013-04-000088 |
Notice of Award *2/15/2013Contract Date ***4/24/2013Notice to Proceed 4/22/2013 |
104 |
Repair of dilapidated roofing, ceiling and affe🌊cted areas of Formal Entry Division, Section 10 at the 2nd floor, MICP |
TRM Construction & Development Corp. |
862,319.25 |
2013-04-000087 |
Notice of Award *3/19/2013Contract Date ***4/23/2013Notice to Proceed 4/22/013 |
105 |
Provi🌞sion of Storage room for the CA✱O-PEAG at the Old NPO Building |
Marcos S. Gonzales Construction Company, Inc. |
1,689,378.60 |
2013-04-000086 |
Notice of Award *4/10/2013Contract Date ***4/23/2013Notice to Proceed 4/22/2013 |
106 |
Repair and Repainting of the Office 💝of the Risk Management Office at the 4th floor, Port of Manila Building |
TRM Construction & Development Corp. |
882,198.00 |
2013-04-000084 |
Notice of Award *3/19/2013Contract Date ***4/22/2013Notice to Proceed 4/15/2013 |
107 |
Expansion of Mezzanine, c🍒omfort room and two (2) offices at the 4th fl🐬oor, Port of Manila |
Marcos S. Gonzales Construction Company, Inc. |
1,781,699.40 |
2013-04-000083 |
Notice of Award *3/27/2013Contract Date ***4/22/2013Notice to Proceed 4/18/2013 |
108 |
Repair and Replacement of dilapidated rooܫfing and gutters and Repair of two (2) units comfort rooms and total replacement of blinds at the 2nd floor of the VCD Building |
OEM Builders |
1,778,059.47 |
2013-04-000082 |
Notice of Award *3/27/2013Contract Date ***4/16/2013Notice to Proceed 4/16/2013 |
109 |
Additional works for the storage facilꦇity of MICP Bonds Division at the 2n🍬d floor, Old NPO Building |
Marcos S. Gonzales Construction Company, Inc. |
1,483,154.40 |
2013-04-000081 |
Notice of Award *4/10/2013Contract Date ***4/5/2013Notice to Proceed 4/15/2013 |
110 |
Provision of one (1) storage faciไlity for the Inteﷺlligence Group at the 2nd floor, Old NPO building |
Marcos S. Gonzales Construction Company, Inc. |
1,681,633.20 |
2013-04-000080 |
Notice of Award *4/10/2013Contract Date ***4/15/2013Notice to Proceed 4/15/2013 |
111 |
Rep𒀰air / Ref🍌urbishment of the OCOM Secretary Office and OCOM lawyers office locate at the Ground floor, OCOM Building |
Cambros Construction Group, Inc. |
1,897,071.05 |
2013-04-000079 |
Notice of Award *4/10/2013Contract Date ***4/15/2013Notice to Proceed 4/15/2013 |
112 |
Provision of the offic🌱e facilities, conference room and comfort room fo🦋r Deputy Commissioner Intelligence Group at Ground Floor, Old NPO Building |
ISJ Builders & Design |
950,595.00 |
2013-04-000077 |
Notice of Award *4/10/2013Contract Date ***4/10/2013Notice to Proceed 4/12/2013 |
113 |
Provision of storage facilities for the Office of the Commissioner Task Force on Rue Enhancement for the Attainment 🔥Collection Targets at Old NPO Building |
ISJ Builders & Design |
963,677.00 |
2013-04-000076 |
Notice of Award *4/9/2013Contract Date ***4/19/2013Notice to Proceed 4/15/2013 |
114 |
vai de bet:3 units Desktop Computer |
Limbag Enterprise |
191,940.00 |
2013-04-000074 |
Notice of Award –Contract Date ***4/8/2013Notice to Proceed — |
115 |
Repair / refurbishment of the Internal Administration Group Office located at th🔯e Ground Floor,♏ OCOM Building |
Cambros Construction Group, Inc. |
1,865,179.60 |
2013-04-000073 |
Notice of Award *3/20/2013Contract Date ***4/8/2013Notice to Proceed 4/8/2013 |
116 |
Refurbishment of the 2nd f﷽loor hallway located at the 2nd f🎃loor, OCOM building |
Cambros Construction Group, Inc. |
1,800,363.75 |
2013-04-000072 |
Notice of Award *3/20/2013Contract Date ***4/8/2013Notice to Proceed 4/5/2013 |
117 |
vai de bet:Repair / Rehabilitation of MICP |
Cambros Construction Group, Inc. |
1,850,659.65 |
2013-04-000071 |
Notice of Award *3/19/2013Contract Date ***4/8/2013Notice to Proceed 4/5/2013 |
118 |
Repair / Rehabilitation of Five (5) units comfort rooms and Repair of 🐽Sewer lines at Port of Tacloban Customhou🦩se |
OEM Builders |
1,748,539.37 |
2013-04-000070 |
Notice of Award *3/26/2013Contract Date ***4/5/2013Notice to Proceed 4/5/2013 |
119 |
Provision of comfort room, partiti🎐ons, counter c😼abinets, fire exits and canopy at Main Entrance, X-ray Building |
OEM Builders |
1,841,964.94 |
2013-04-000068 |
Notice of Award *3/26/2013Contract Date ***4/5/2013Notice to Proceed 4/5/2013 |
120 |
vai de bet:75 Units APS UPS 650VA |
MAATO Trading A.G.S. |
483,750.00 |
2013-04-000067 |
Notice of Award –Contract Date ****4/2/2013Notice to Proceed — |
121 |
P🅰rovision of Mezzanine floor, 3 rooms cubicle, server room, stock room, training room, meeting room and comfort rooms at the MISTG Office located at the 3rd floor, Room 315, Port of Manila |
ISJ Builders & Design |
1,812,215.00 |
2013-04-000063 |
Notice of Award *3/20/2013Contract Date ****4/1/2013Notice to Proceed 3/26/2013 |
122 |
Re🎃furbishment of the OCOM Office of ജthe Executive Assistant located at the Ground Floor, OCOM Building |
Cambros Construction Group, Inc. |
1,870,405.00 |
2013-03-000062 |
Notice of Award *3/20/2013Contract Date ***3/27/2013Notice to Proceed 4/1/2013 |
123 |
Renovation of 🃏(1) Conference room and (2) Extension 🌳Offices at the 4th floor, Prosecution Litigation Division, port of Manila Building |
Marcos S. Gonzales Construction Company, Inc. |
1,499,191.31 |
2013-03-000061 |
Notice of Award *3/19/2013Contract Date ***3/27/2013Notice to Proceed 3/27/2013 |
124 |
vai de bet:8 units Projector (Document Reader) |
Genaro Trading |
384,000.00 |
2013-03-00058 |
Notice of Award –Contract Date ***3/25/2013Notice to Proceed — |
125 |
Various Electronics 1 pc. Camera 1 pc😼. Card Reader 1 pc. 4 gb Memory Card |
Genaro Trading |
20,100.00 |
2013-03-000057 |
Notice of Award N/AContract Date ***3/25/2013Notice to Proceed N/A |
126 |
1500 copies of BOC Strategic Plan fo♛༒r 2013-2017 1 Xintra Board |
JDB Pixels Graphic Design Services |
286,630.00 |
2013-03-000056 |
Notice of Award –Contract Date ***3/19/2013Notice to Proceed — |
127 |
Provisio♒n of mezzanine floor, wooden cabinets and fire exit at MICP |
ISJ Builders & Design |
1,850,666.00 |
2013-03-000055 |
Notice of Award –Contract Date ***3/19/2013Notice to Proceed 3/19/2013 |
128 |
Replacement of worn o𒊎ut tiles into granite tiles at the building ༒303, Port of Subic |
ISJ Builders & Design |
1,246,557.00 |
2013-03-000054 |
Notice of Award *3/19/2013Contract Date ***3/18/2013Notice to Proceed 3/20/2013 |
129 |
Repair / Replacement of damaged concrete pa🐈vement of X-ray Scanning Facility at ICTSI, MICP |
ISJ Builders & Design |
1,947,00.01 |
2013-03-000053 |
Notice of Award *3/19/2013Contract Date ***3/18/2013Notice |
130 |
Additional Works for the storage facility of MICP, Law Division at the 2nd F💞loor, Old NPO Building |
Cambros Construction Group, Inc. |
1,338,051.00 |
2013-03-00052 |
Notice of Award *3/19/2013Contract Date ***3/15/2013Notice to Proceed 3/13/2013 |
131 |
Re-bidding of the Expansio❀n of Administratio🦋n Building, at the Port of Davao |
Lotrim Construction |
17,203,203.18 |
**N/A |
Notice of Award 2/18/2013Contract Date 3/15/2013Notice to Proceed 4/2/2013 |
132 |
Installation of Drainage System, Interlocking flooring🗹 (portion only) and Repair of concrete pavement and BOC Customhouse, Legaspi City, Albay |
OEM Builders |
1,769,223.23 |
2013-03-000051 |
Notice of Award *2/27/2013Contract Date ***3/14/2013Notice to Proceed 3/15/2013 |
133 |
vai de bet:Various Motor Vehicle Stickers |
Limbag Enterprise |
45,000.00 |
2013-03-000050 |
Notice of Award N/AContract Date ***3/12/2013Notice to Proceed N/A |
134 |
Pr♋ovision of roofing works and retiling of flooring at ⛦roof deck, Multi-purpose Hall at the Port of Batangas, Batangas City |
ISJ Builders & Design |
1,452,594.00 |
2013-03-000047 |
Notice of Award *2/15/2013Contract Date ***3/11/2013Notice to Proceed 3/11/2013 |
135 |
Ad𝔍ditional Renovation and Refurbishment of the conference room and the Office of the Commissioner at Ground Floor, OCOM Building |
Cambros Construction Group, Inc. |
1,776,958.75 |
2013-03-000047 |
Notice of Award *3/5/2013Contract Date ***3/12/2013Notice to Proceed 3/11/2013 |
136 |
Refurbishment / Renovation at the ICARE Storage Areas located at the Old NPO Buildin🐼g |
Cambros Construction Group |
1,359,438.60 |
2013-03-000046 |
Notice of Award *3/5/2013Contract Date ***3/6/2013Notice to Proceed 3/11/2013 |
137 |
vai de bet:130 boxes Various Medicine |
Medi-RX |
79,490.00 |
2013-03-000045 |
Notice of Award –Contract Date ***3/5/2013Notice to Proceed — |
138 |
12 pcs.𓆉 Battery 3sm 2pcs Genset Battery 4D 16 gallon Diesel Enghine ღOil |
RMZ Enterprises |
170,820.00 |
2013-03-000044 |
Notice of Award –Contract Date ***3/5/2013Notice to Proceed — |
139 |
Renovation / Refurbishment of the Office of the Chief of Staff, OCOM, Tax Credit Secretar𓄧iat Office and the Task force REACT locate at the OCOM Building |
Cambros Construction Group, Inc. |
1,695,493.85 |
2013-03-000042 |
Notice of Award *3/5/2013Contract Date ***3/5/2013Notice to Proceed 3/12/2013 |
140 |
Construction of meeting 🥀rooms, Pantry Room,& CPU Room locatꦚed at the 1st floor, Formal Entry Division, EPU, Port of Manila Building |
Cambros Construction Group, Inc. |
1,699,237.80 |
2013-03-000041 |
Notice of Award *3/5/2013Contract Date ***3/5/2013Notice to Proceed 3/11/2013 |
141 |
vai de bet:Various Medicines & Supplies |
Ethijar Trading |
50,370.00 |
2013-02-000040 |
Notice of Award N/AContract Date ***2/25/2013Notice to Proceed N/A |
142 |
vai de bet:4000 ꦆpcs. Print💖ing of BOC Monthly Newsletter |
The BIZ Update Publication |
172,000.00 |
2013-02-000037 |
Notice of Award –Contract Date ***2/22/2013Notice to Proceed — |
143 |
Refurbishing of𓆉 Brokers Lounge Area, Kiosk and Consultation Room at Ground Floor, MICP |
ISJ Builders & Design |
948,465.00 |
2013-02-000034 |
Notice of Award *2/12/2013Contract Date ***2/22/2013Notice to Proceed 2/21/2013 |
144 |
Provision of 5 sets of coꦕmfort room and Provision of open shelves and cabinets at Sual, Pangasinan |
ISJ Builders & Design |
1,462,043.00 |
2013-02-000033 |
Notice of Award *2/8/2013Contract Date ***2/19/2013Notice to Proceed 2/18/2013 |
145 |
Provision of 3 sets 🔯of comfort rooms at the One-Stop-Shop, Bauan, Batangas |
ISJ Builders & Design |
1,537,631.00 |
2013-02-000031 |
Notice of Award *2/12/2013Contract Date ***2/15/2013Notice to Proceed 25/15/2013 |
146 |
Replacement of Electrical serviceღ entrance cable at VCD-IAS Building |
ISJ Builders & Design |
329,039.00 |
2013-02-000030 |
Notice of Award *2/12/2013Contract Date ***2/14/2013Notice to Proceed 2/13/2013 |
147 |
Repair / Renovation of the Customhouse, Sub-port oꩲf Dumaguete |
Cambros Construction Group, Inc. |
1,860,351.44 |
2013-02-000028 |
Notice of Award *2/5/2013Contract Date ***2/14/2013Notice to Proceed 2/15/2013 |
148 |
Provision of ཧ3 septic vault and Provision o a new sewe♐r line system in front of the Flagpole, OCOM Building |
JEMN Builders |
1,423,488.00 |
2013-02-000024 |
Notice of Award *2/8/2013Contract Date ***2/11/2013Notice to Proceed 2/11/2013 |
149 |
Provision of built-in cabinets at 4th floor, Asseꦺssment building, MICP |
ISJ Builders & Design |
693,485.00 |
2013-02-000023 |
Notice of Award *1/14/2013Contract Date 2013-02-000023Notice to Proceed 2/11/2013 |
150 |
Repainting of the stage flagpole, repainting of the con🎃crete stairs in front of the POM Building, Brick tiles and perimeter fence at the Port of Manila |
ISJ Builders & Design |
1,773,395.00 |
2013-02-000022 |
Notice of Award *2/8/2013Contract Date ***2/11/2013Notice to Proceed 2/11/2013 |
151 |
Rehab🧔ilitaion of Perimeter fence with additional main gate, provision of cubicle, cabinets, open shelves, 2 units split type 2 HP and concreting of right of way / pathway located at Port of Limay, Bataan |
ARMAL Construction Supply & Services, Inc. |
1,484,368.24 |
2013-02-000021 |
Notice of Award *2/8/2013Contract Date ***2/8/2013Notice to Proceed 2/11/2013 |
152 |
Repair of Legal Service Rooms at 4th floor, Port of Man🦄ila |
Cambros Construction Group, Inc. |
1,634,889.80 |
2013-02-000017 |
Notice of Award *1/29/2013Contract Date ***2/4/2013Notice to Proceed 2/7/2013 |
153 |
vai de bet:Various air-con materials |
Lerenjo’s Trading |
428,560.00 |
2013-01-000015 |
Notice of Award –Contract Date ***1/31/2013Notice to Proceed — |
154 |
4𝓀0 pcs. Duplo Master Toll (RDC-42) 96 pcs. Duplo🐎 Ink 514k 1 pc. Master Ejection Motor 1 pc. Spring T |
Gakken Philippines Inc. |
220,560.00 |
2013-01-000014 |
Notice of Award –Contract Date ***1/31/2013Notice to Proceed — |
155 |
Renovation of Garments Di✅vision and Provision of two (2) Units Comfort rooms and Built-in cabinets at the 2nd floor, POM Buil𒁏ding |
OEM Builders |
1,562,123.39 |
2013-01-000012 |
Notice of Award *1/29/2013Contract Date ***1/30/2013Notice to Proceed 1/30/2013 |
156 |
vai de bet:NUCTECH 6 mos. Jan. to June 2013 |
Nuctech Company Limited |
120,598,656.75 |
*N/A |
Notice of Award 1/29/2013Contract Date ***1/30/2013Notice to Proceed 2/1/2013 |
157 |
Repair of🧜 ceiling / electrical wiring of Port of Zamboanga Customhouse |
ISJ Builders & Design |
1,847,982.50 |
2013-01-000009 |
Notice of Award *1/14/2013Contract Date ***1/23/2013Notice to Proceed 1/23/2013 |
158 |
Installation of ESS Control Gate at ꧅Parking Area, ESS Compound |
ISJ Builders & Design |
901,375.00 |
2013-01-000008 |
Notice of Award *1/14/2013Contract Date ***1/23/2013Notice to Proceed 1/23/2013 |
159 |
vai de bet:75 pcs. HP85A Toner |
Renovatech Inc. |
198,750.00 |
2013-01-000006 |
Notice of Award –Contract Date ***1/18/2013Notice to Proceed — |
160 |
4✤ units 3-toner Air Condition Units standing 3 units 2.5 – toner Air Condition split type |
MAARO Trading A.G.S. |
452,000.00 |
2013-01-000003 |
Notice of Award –Contract Date ***1/16/2013Notice to Proceed — |